PropertyMove Estates

Almost half of Londoners have used Elizabeth Line according to study

The Elizabeth Line cost £19 billion to complete
The Elizabeth Line cost £19 billion to complete (Image: PA Wire/PA Images)

Almost half of people living in London have used the Elizabeth Line, a fresh survey has revealed. The results of a YouGov poll shared with the PA news agency indicate 45% of the capital’s residents have made at least one journey on the £19 billion railway.

That is up from 24% in July last year. The latest survey – conducted in late January – suggested that people aged 18-24 are most likely to have used it (53%).

javascript:void(0)

That is followed by those aged 25-49 at 49%, falling to 39% for the 50-64 category and just 29% for Londoners at least 65 years old. The proportion of users who said they took a special trip out of their way to see what the railway was like has fallen from 37% in July 2022 to 25%, suggesting it has become more a part of people’s daily lives.

READ MORE: Interactive map shows Berkshire areas with worst air pollution

Commercial property news site Bisnow reported earlier this month that flexible office company WeWork has experienced an increase in demand for its locations near Elizabeth line stations since services began.

Flexible bookings at those sites rose by an average of 28% between the railway’s opening and November last year.

The Elizabeth line stretches from Reading and Heathrow Airport to Abbey Wood in south-east London and Shenfield in Essex. It runs via tunnels built by the Crossrail project between Paddington in west London and Abbey Wood.

More than 100 million journeys have been made on the line. Transport for London (TfL) said on February 1 that ridership is “above expected levels” with around 600,000 daily journeys.

Kingdom Of MenThe way you make your fist reveals something crucial about your personality.

Crowdy Fan10 Foods That Unclog Arteries (Most People Ignore)

by Taboola

Sponsored Links

It added that the railway is “on track to break even” based on operating costs by the end of the 2023/24 financial year. Crossrail suffered numerous issues including construction difficulties and complications in installing signalling systems.

Leave a Comment

Your email address will not be published. Required fields are marked *

Open chat
1
Need help?
Property Move Estates
Hello,
How can i help you today?